May 25, 2023
The Town of Frisco has contracted A.D. Miller to renovate the existing Day Lodge and construct the new Slopeside Hall, a two-story, 7,880-square-foot building in the Frisco Adventure Park. Once completed in 2024, “it will be the first “zero-emission” facility...
Apr 15, 2024
Cherry Park is a neighborhood park situated at the top of the hill, offering a great view of the Front Range Mountains. A.D. Miller was contracted to renovate the park; the scope of work included demolition, sub-grade drainage system, new concrete sub slab, new play...
Sep 27, 2022
This new pool facility is a welcome addition to the community of Limon. Two in-ground pools will provide recreational opportunities for all ages and abilities. The main facility includes a playfully designed, 3,000-square-foot bathhouse with a shower and locker room,...
Sep 20, 2021
This 96-acre park offers soccer/football fields, picnic shelters with concessions, an off-leash dog park, 14.76 acres of multi-purpose bluegrass fields, 3 miles of concrete trail, playgrounds, and an amphitheater that hosts summer concert series, as well as firework...
Dec 28, 2021
The playful, modern design of the addition complements the existing building’s CMU banding with other linear elements. A standing seam metal roof doubles as a covered entry and a sunshade for the front-facing glass curtain wall allows winter-season natural light to...