PORTFOLIO
The Goddard School
This development is a 330,000-square-foot office space in three buildings located in Boulder, Colorado. The new location houses 1,500 employees and includes fun, new features such as bike repair stations, cafeteria, fitness center, indoor courtyard and game rooms.
Summit Church
Summit Church was a addition and remodel project in Centennial, Co.
Canvas Credit Union (In Progress)
76,000 SF Occupied Building Remodel and Tenant Finish. Project was a 3 floor phased project, with tenants occupying a minimum of 2 floors during the entire construction. Project included adding 4th Floor Roof Top Conference Room Addition, which was also completed while building was occupied. AV/LV/Security were all coordinated with owner. Building was fully secured […]
RTD Center
This remolded was done to satisfy historical standards while bringing a modern vibe to a classic building. The project took 8 months and was finished under budget.
Living Hope Baptist Church
CM at risk with full pre-construction involvement, design/ build mechanical/ electrical/ plumbing, site development, utilities and ground-up church construction.
Partner Colorado Credit Union
8000 SF two-story addition with a walk out basement that connected to the existing credit union.
On Tap Credit Union
6500 SF historic renovation of a previous mechanic shop into a full-service credit union.
Atonement Lutheran Church
This congregation has experienced steady growth throughout its history. The new facility will include a new 242 seat worship space, sacristy, storage and Narthex. The additional building area required a reconfiguration of the site and the addition of new parking. Building construction consists of caissons, foundations, bar joists, metal deck, concrete topping, steel studs, brick […]
Lord and Taylor
Addition of a high-end retail sales space to the existing store, while maintaining full store operations.
