Hard bids are all a part of a day’s work here at AD Miller. You send us your construction documents and we aggressively bid to make your dream a reality by the most economic means necessary. Things like analyzing alternative construction methods, researching the market for comparative costings, sourcing cost-effective suppliers/subcontractors and utilizing value-engineering options are all part of this process. But, don’t misunderstand, we never sacrifice quality, lure you in with unrealistic timelines or compromise safety to make our value proposals happen. Rather, we do our homework, rely on our teamwork and have strong, long-term working relationships with scores of talented, trusted subcontractors to get us over the finish line– on time and within budget.
HARD BID PROJECTS
Canvas Credit Union (In Progress)
76,000 SF Occupied Building Remodel and Tenant Finish. Project was a 3 floor phased project, with tenants occupying a minimum of 2 floors during the entire construction. Project included adding 4th Floor Roof Top Conference Room Addition, which was also completed while building was occupied. AV/LV/Security were all coordinated with owner. Building was fully secured […]
RTD Center
This remolded was done to satisfy historical standards while bringing a modern vibe to a classic building. The project took 8 months and was finished under budget.
Partner Colorado Credit Union
8000 SF two-story addition with a walk out basement that connected to the existing credit union.