Jun 7, 2022
This design/build project for the Country Club at Woodmoor began with demolishing the existing pool and bathhouse before constructing replacement facilities. The gated area features a pool house with showers, toilets, lockers, a two-lane lap pool, a splash pad, and...
Apr 8, 2019
Summit Church was a fast-track construction project providing the congregation with a space that’s open and flexible concerning programming. The church’s exterior is primarily a masonry and precast construction that delivers a high-performance structure...
Jan 3, 2019
The Living Hope Baptist Church is a new, ground-up project. The durable and attractive standing seam metal roof in a green tone accentuates the grand entry and vestibule and beautifully reflects the sky and light. The massing of the church is rhythmic and playful,...
Jan 2, 2019
This newly constructed bank branch is located in the Central Park redevelopment area. This urban infill project balanced a full-service banking program with a challenging set of site metrics including circulation for drive-through banking lanes, and surface parking on...
Jan 3, 2019
The 22-000-square-foot Aurora Federal Credit Union transformed a former auto repair shop and was sitting vacant in a shopping center parking lot. The design created an identity for the bank that is inviting and professional. Punching in windows fenestrations allow...